Landfill Gas-To-Energy Plant Addition

Project Description: The project consisted of installing landfill gas conditioning equipment at a local landfill to run three Jenbacher JMS320 gensets with downstream heat recovery steam generators (HRSG). The facility produced 125 psig of saturated steam from the engine exhaust and hot water from the engine jacket for use in a nearby correctional facility. Scope of…

Read More

Solar Photovoltaic Energy System

Project Description: The City Utilities of Springfield solar farm is located near the McCartney Generating Station and is the largest solar farm in the state of Missouri. Sega performed a solar feasibility study, provided an equipment specification, and supported the City through contract award. The solar installation has the potential to generate 4.95 megawatts of power….

Read More

Bubbling Fluidized-Bed Boiler Addition

Project Description: The project included the following components: Demolition of an existing coal-fired circulating fluidized-bed boiler New 150,000 lb/hr bubbling fluidized-bed boiler firing 100% biomass New material handling equipment and storage silos for coal and biomass Scope of Work: Sega provided engineering design services in support of this project. The boiler was pre-purchased under a separate contract….

Read More