Chile Boiler Upgrade Projects

In January of 2012, Joe Fehr and Andy Haun traveled to Mejillones and Tocopilla in northern Chile to walk down six coal-fired boilers for the purposes of preparing an engineering services proposal (the scope of which was largely uncertain).  The boilers are used as prime movers for steam turbine-generator sets in that region of the…

Read More

Jameson Energy Center

Project Description: This project included the land development and installation of three natural gas-fired combustion turbine units, Siemens model SGT-40, equipped with dry low emissions (DLE) systems. The plant is nominally rated 27-MW. Sega performed all plant design including permitting, sitework, foundations, buildings, balance-of-plant (BOP) systems, and 34.5-kV electrical substation. Sega procured major BOP equipment…

Read More

Orange Grove Combustion Turbine Plant

Project Description: This EPC project included the site development and the installation of two 45-MW simple cycle combustion turbine generators (General Electric LM6000 PC Sprint) to a “Greenfield” site. The project included site preparation, a two-mile gas pipeline, trucked-in water supply, 69-kV underground transmission line to utility substation, foundations, maintenance building with central control room,…

Read More

Chouteau 2 Combined-Cycle Plant

Project Description: Sega Inc. was the owner’s engineer for the relocation and construction of a 500-MW Nominal 2-on-1 Siemens combined cycle plant. Sega Inc. developed and negotiated the engineer, procure and construct (EPC) power block construction contract and provided detailed design for the site preparation, water treatment, chiller retrofit and other construction packages. Sega Inc….

Read More