Electric Utilities
We have provided a sampling of completed projects for Utility clients.
McCartney Generating
Station, CT Addition Project
City Utilities of Springfield, MO
This was a Greenfield project that included two
50-MW gas turbine generators and substations. The project also
included site preparation, foundation, maintenance/control
building, gas compressors, and fuel oil storage. Sega provided
design and construction services on this project.
Gas Turbine Addition, City
of Chanute, KS
Installation of a single 50-MW Siemens Westinghouse
combustion turbine generator at an existing site.
Unit 1 Control System
Upgrade
City of Sikeston, Sikeston, MO
Obsolete control and instrumentation systems for
Unit 1 were replaced with a modern distributed control system (DCS).
Sega’s services included the preparation of
equipment and installation specifications and drawings, as well as
the design and test of the application software for the control
systems and for the operator interface. Specifications were also
prepared for the procurement of the new protective relays.
A low-fidelity permanent simulator was also
designed and configured by Sega. This simulator was
used to check out the control system configuration software and to
conduct operator training prior to the upgrade of the unit.
Unit 1 Control Retrofit -
Nearman Power Station
Board of Public Utilities, Kansas City, KS
Obsolete control and instrumentation systems for
Unit 1 were replaced with a modern distributed control system (DCS).
Sega’s services included the preparation of
equipment and installation specifications and drawings, as well as
the design and test of the application software for the control
systems and for the operator interface. Specifications were also
prepared for the procurement of the field equipment such as
transmitters, I/P positioners, miscellaneous valves and control
drives.
A low-fidelity permanent simulator was also
designed and configured by Sega for this project. This simulator was
used to check out the control system configuration software and to
conduct operator training prior to the upgrade of the unit.
Sioux Generating Station,
Units 1/2 Controls Upgrade
AmerenUE, St. Louis, MO
AmerenUE first selected Sega to prepare a
conceptual design to define the scope and establish budget and
schedule requirements for upgrading controls on these two 488-MW
supercritical units. Upon completion of the conceptual design,
Sega was retained to provide all engineering services required for
this project.
Units 1/2 Controls Upgrade
and Plant Monitor Information System
Associated Electric Cooperative,
Clifton Hill, MO
Replaced existing control and information systems
for two cyclone-fired units to resolve equipment obsolescence
problems and to provide the more complex control strategies required
for fuel conversion to western coal.
These services began with a conceptual design to
define project requirements and included equipment and installation
specifications as well as preparation of all application software,
construction review, and startup.
Original panelboards and instrumentation were
replaced with "touch-screen" CRT-based operator interface
devices. HVAC and lighting systems were upgraded to meet the
requirements of the new operator interface and distributed control
system equipment.
In addition to meeting the control objectives, the
new distributed control system provides operating information to key
plant management and engineering personnel through PC-based
supervisory stations connected to a plant-wide LAN.
Power Production
Improvement for Blue Valley and Missouri Valley Station CTs
City of Independence, MO
Performed a wide variety of plant betterment
projects. Worked on cooling towers, control system
replacement, continuous emission monitor, combustion turbines,
boiler overhauls, precipitator upgrades, new coal feeders and coal
handling upgrades, and several other miscellaneous projects.
<
Top of Page >
Package Boiler Replacement
City of Coffeyville, KS
Sega replaced two existing field-erected boilers at
the municipal power plant with one field-erected package boiler.
Council Bluffs Controls
Upgrade and Plant Monitoring and Information System
MidAmerican Energy Company, Council Bluffs, IA
Replaced obsolete control and monitor systems on a
nominal 700-MW coal-fired unit with a microprocessor-based
distributed system. Approximately 30 linear feet of
conventional operator benchboard was replaced with a CRT/keyboard-based operator interface center. Control room
renovations included new offices and new lighting as required to
meet ergonometric criteria. After the unit was started, Sega
was commissioned to develop and install a new plant-wide performance
monitoring and information system.
Package Boiler and Services at Prairie Creek, Sixth Street, and Sutherland
Stations
Alliant Energy - IES Utilities, Cedar Rapids, IA
|
Services Provided for Prairie Creek
Station
and Sixth Street Station
-
Package Boiler Installation
-
Export Steam System Controls
Modifications
-
Attemperating Water System Modifications
-
Turbine Generator Piping and Controls
-
Boiler Controls Tuning
-
SO2 and SO3 Piping Stress Analysis
-
Back-pressure Steam Turbine Generator
-
700-lb Header Installation
-
Turbine Inlet Piping Replacement
-
200-lb Steam System Crosstie Installation
-
O2-Fuel-Air Controls
-
Fuel Alternative Study
-
New Steam Supply to Quaker Oats
|
Services Provided to Sutherland Station and
Red Cedar Cogen
|
Perry Station Control
Retrofit
Indianapolis Power & Light Company, Indianapolis, IN
Replaced obsolete electromechanical instruments
and controls with microprocessor-based distributed control system
for combustion control and flame safeguard on Perry "K"
Station, Units 11 through 16. Configuration software was designed at
Sega's staging facilities, then loaded and debugged on-site.
Start-up services included system checkout, operator training, and
delivery of customized operation manuals. By providing a
full-scope engineering service, Sega guaranteed single-source
accountability for the reliability of the new system.
Montrose Station Controls
Replacement
Kansas City Power & Light Company, Clinton, MO
Replace outdated pneumatic control system for three
175-MW coal-fired units with microprocessor-based distributed
control system.
Sega wrote technical specifications for purchase of
the control system, including electronic transmitters to replace
pneumatic transmitters and control drives to replace outdated
control drives. Sega prepared construction documents and provided
on-site consulting for installation of the new controls and
associated equipment. To ensure that the control system met the
unique requirements of Montrose Station and provided single-source
accountability for system operations, Sega custom designed the
configuration software and wrote the operation manuals. A complete
checkout for both hardware and software was completed at Sega’s
offices prior to installation. Using a dynamic mathematical model of
the plant, Sega staged computer simulations to train system
operators prior to startup. Actual installation and startup (startup
was performed by Sega control specialists) took less than five weeks
for each unit. Using Sega’s custom-designed software, the
computer-based system provides more precise control, better
turndown, more flexible operations, and improved emissions control.
< Top of Page
>
Montrose, La
Cygne, Hawthorn, Iatan, and Northeast CT
Kansas City Power & Light Company, MO and KS
As part of a miscellaneous engineering services
agreement with KCPL, Sega has performed a number of projects.
|
La Cygne Station
-
Boiler Replacement (three 200,000 lb/hr)
-
Mill Inerting Piping Modifications
-
Coal Silo Expansion
-
Raceway Additions
-
Transformer 3 Investigations
-
Slurry Booster Pump Addition
-
Cooling Water System Upgrade
-
Water Lance Sootblower Modification
-
Fuel Yard Controls Replacement
-
Flame Scanners
-
Crusher Feeder Modifications
-
Potable Water System Modifications
-
AQC Modules Instrument Replacement
-
Demineralizer Replacement
-
Honeywell Control of Crusher Feeder 2B
-
Plant Controls Replacement with DCS
|
Montrose Station
-
HVAC Unit Addition
-
Desuperheater Line Supports
-
Replacement (Unit 3)
-
Plant Controls Replacement with DCS
-
Duct Burners for Increased Mill Capacity
Hawthorn Station
-
West Treatment Plant Lift Station
Modifications
-
HVAC Study - Office Computer and Control
Room
-
Fuel Yard Dust Suppression / Collection
Project
-
Fiber Optic Failure Investigation
-
Mill Inerting Addition
-
PLC Data Highway Communications
Modifications
-
Coal Handling Controls Replacement
Northeast Station
|
Power Plant Improvement
Projects (Plant Betterment)
St. Joseph Light & Power Company, St. Joseph, MO
Sega has provided engineering services in support
of a number of power plant improvement projects at the St. Joseph
Light & Power Company Lake Road Station. They were part of
a miscellaneous engineering services agreement.
-
Two 20-MW Gas Turbine Generator
Installations
-
Well Water Pump Installation
-
Valve Bypass Installation
-
Boiler 3 Air Handler Investigation
-
900-lb Header Inspection
-
Oil Pump House Replacement
-
Turbines 6 and 7 Remote Control Panel
-
Rotary Dumper Repairs
-
Feedwater Heater Weld Crack Investigation
-
Boiler 6 Header Upgrade
-
Boiler 5 Safety Valve Replacement
-
Zeolite Valve Replacement
-
Attemperator Nozzle Installation
-
Air Compressor Installation
-
Plant Bunker Cone Analysis
-
Softener Retrofit
-
Booster Pump Replacement
|
-
Lime Slurry Pump Replacement
-
Control Room Upgrade
-
No. 6 Fuel Oil System Evaluation
-
Lube Oil Filter Installation
-
Ultrasonic Thickness Testing Bunker Cone
6-2
-
Boiler 6 Chimney Turning Vanes Review
-
Safety Valve Capacity Evaluation
-
Hanger Inspection
-
Propane System Relocation
-
Boiler 7 Upgrades
-
No. 2 Fuel Oil Storage Tank Filter
Installation
-
Coal Handling Upgrades
-
Pressure Filter Replacement
-
Well Water Piping Replacement
-
Controls Upgrades
|
Grand Avenue Plant ST
Generator and Precipitator Replacement
Trigen Energy Corporation, Kansas City, MO
Trigen's coal-fired utility plant in downtown
Kansas City cogenerates chilled water, steam, and electricity.
The steam and chilled water are distributed to industrial and
commercial customers in this area.
Steam Turbine Generator
The Grand Avenue Plant was supplying steam direct from a
high-pressure boiler through a pressure-reducing valve (PRV). To
improve the economics of the plant, a 5-MW back-pressure steam
turbine electric generator was used to replace the PRV. Sega
designed the foundation, piping systems, and electrical connections
for the turbine generator. Sega prepared plans and specifications
for bidding and construction of the balance-of-plant structures and
systems to support the turbine generator. Sega provided full-time
on-site construction management to coordinate the various suppliers
and contractors involved in the project. We also coordinated the
start-up activities and performance testing.
Precipitator Replacement
The precipitator used to clean the coal-fired boilers flue gases
was destroyed by fire. The plant was operating on high-priced
natural gas backup fuel. A replacement precipitator was furnished
and installed on a fast-track basis. Sega designed and prepared bid
documents for precipitator auxiliaries including new ductwork,
chimney repairs, platforms, lighting, and architecture.
< Top of
Page >
Unit 1
Upgrade
Alabama Electric Cooperative, Inc. , Leroy, AL
Sega provided engineering services at the Charles
R. Lowman Power Plant. We replaced the following: coal
feeders, burner management system, precipitator, and boiler
insulation and lagging. The project also included converting
the boiler from pressurized to balance-draft operation and other
boiler modifications.
Waste to Energy
Alliant Energy, Cedar Rapids, IA
Sega helped with conceptual design, detailed design
engineering, plans and specifications, equipment procedures, controls
configuration, and complete startup on this plant.
The project included a 5-MW turbine generator,
precipitator, ash handler, waste-handling facility, fluidized-bed
gasifier, steam boiler, cooling tower, and a substation.
Chariton Valley Biomass
Alliant Energy - IES Utilities, Ottumwa, IA
Sega provided engineering, procurement, and
construction of the facility to handle the switchgrass going into
the boiler at the Ottumwa Generating Station.
The project needed: building, transformer, motor
control centers, de-bailer, belt conveyors, shredders, storage
hopper, feeders, blowers, piping, wiring, and controls.
Controls System Upgrade
Units 1, 2, 3, and 4 - Labadie Power Plant
AmerenUE, Labadie, MO
Obsolete control and instrumentation systems were
taken out and replaced on four- coal-fired generating units. The
units are similiar 600-megawatt pulverized-coal drum-type units with
identical boilers.
The following were replaced in each unit: sequence
of events, digital alarm monitor, data acquisition, motor control,
combustion control, turbine controls (Units 1 and 2), interfaces,
BTG consoles and panels, and transmitters.
Combustion Turbine
Generator Set Addition - Venice Power Station
AmerenUE, Venice, IL
The project had Sega provide engineering services
for the addition of a new 50-MW combustion turbine generator set at
the Venice Plant.
Also included were site preparation, foundation,
service building, gas compressor, and fuel oil storage.
< Top of Page
>
Unit 4 Control Systems
Upgrade - Judson large Generating Station
Aquila Networks, Dodge City, KS
Sega was hired to replace the existing outdated
control and instrumentation systems for one gas-fired 150-MW unit
with a microprocessor-based distributed control system.
The following were replaced: combustion controls,
burner management, turbine controls, data acquisition,
alarm/sequence of events, motor controls, and BTG board.
Unit 2 Control Retrofit -
Quindaro Power Station
Board of Public Utilities, Kansas City, KS
Sega was selected to replace the existing control
system for a 145-MW pulverized-coal-fired steam generating unit and
three combustion turbine generators.
The following were replaced: combustion controls,
burner management, turbine controls, data acquisition,
alarm/sequence of events, motor controls, and BTG board.
Boiler Replacement
City of Coffeyville, KS
The city decided to replace the inefficient
existing boilers with a field-erected package boiler rated at
200,000 lb/hr, 900 psi, 900 degrees F.
The project included asbestos removal,
lunch/training room, structural steel/foundation, demolition of
existing boiler, deaerating heaters, controls, control room
expansion, main steam piping to turbine generator, and repair and
place in service feedwater heaters.
Unit 1 Controls Upgrade -
Asbury Plant
Empire District Electric Company, Asbury, MO
Sega replaced obsolete control and instrumentation
systems on Unit 1, a 205-MW cyclone-fired drum-type coal-fired unit.
The following were replaced: combustion controls,
burner management, turbine controls, data acquisition, alarms,
bottom ash controls, and motor controls.
Controls Upgrade
Energy Systems Company, Omaha, NE
The project was to replace existing obsolete
controls and instrumentation systems for boilers, chillers,
balance-of-plant, and SCADA.
The following were replaced: combustion controls,
steam turbine controls, steam metering, boiler feedwater controls,
condensate system controls, chiller controls, chilled water
distribution system controls and metering, cooling tower controls,
condensing water system controls, SCADA/data acquisition system,
networking of operational data, and plant HVAC controls.
Controls Upgrade - North
Denver Station
Hastings Utility, Hastings, NE
This project was a distributed control system
(DCS) retrofit with boiler upgrades, auxiliary power upgrades, and
turbine water induction protection system (TWIPS).
For a detailed description of any project, please contact Steve Hinderliter at 913-681-2881.
|